7f974d974939a36525c9fda0ebe5df223e5edfbd
2
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
7f974d9749 |
feat(mcp): enter_project becomes a small primer: goal, recent work, open work, vocabulary (#4045)
CI & Build / Python lint (push) Successful in 3s
CI & Build / Plugin hooks (push) Successful in 9s
CI & Build / integration (push) Successful in 46s
CI & Build / TypeScript typecheck (push) Successful in 53s
CI & Build / Python tests (push) Successful in 1m44s
CI & Build / Build & push image (push) Successful in 23s
The handshake carried the whole project record, every milestone's plan, full rule text, the notes most recently edited and ~9k of design guidance. For project 2 that was ~222k characters, past what an MCP client accepts as a tool result. Each category was walked through with the operator and sized to what a session needs on arrival; each names the call that has the rest. - project: id, title, status and the full goal (session start's "full goal" pointer still lands here). get_project keeps the whole record. - milestone_summary: the 5 most recently touched milestones, any status, most recent first, without plans. Summaries gain last_touched_at: the later of the milestone's own edit and its newest step update, from the query that already counts steps. milestone_summary_omitted counts the rest and points to list_milestones. get_project and list_milestones list every milestone, also without plans. - open_tasks: the 10 most recently touched open tasks, with or without a milestone, each naming its milestone. list_notes gains sort="touched" (the later of updated_at and the newest work-log), because a log doesn't bump updated_at. - recent_notes: dropped. Retrieval surfaces notes by relevance, and get_recent covers recency. - systems: id and name. - design_system: summary plus guidance_call. get_design_system gains resolved_guidance, the chain-merged prose; its own guidance field is only the departures, so session start's old pointer to it led to a fragment. The session start pointer and using-scribe's "Building UI" section now name resolved_guidance. - rules: rules_payload(brief=True) gives project_rules as id and title plus subscribed_rulebooks, and records only what it shows. Retrieval delivers rules in full and ignores subscriptions (#4052). Other callers unchanged. - pattern_coverage, inception and systems_bootstrap: unchanged. Clients: the plugin's using-scribe skill, the compaction notice and session start are updated here; the REST project summary only gains last_touched_at. Plugin version minted. Tests: a size ceiling on the handshake for a large project; milestone and task selection and naming; brief rules; resolved_guidance; the session start pointer; and a real-Postgres test that a work-log touches its task and a step update touches its milestone. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01821k5B3Ysecp9fNYs92Kuy |
||
|
|
9b2de3552f |
fix(mcp): project reads list milestones without their plans, and cap done ones (#4045)
CI & Build / Python lint (push) Successful in 3s
CI & Build / Plugin hooks (push) Successful in 11s
CI & Build / TypeScript typecheck (push) Successful in 53s
CI & Build / integration (push) Successful in 1m0s
CI & Build / Python tests (push) Successful in 1m32s
CI & Build / Build & push image (push) Successful in 30s
enter_project returned every milestone's full plan body. On a project with 39 milestones the handshake came to ~222k characters, 168k of them bodies (110k from done milestones). That is past what an MCP client accepts as a tool result, so the call meant to orient a session arrived as a file to page through. It grows with a project's history, so any long-lived project on any install gets there. - brief_milestone_summary (services/milestones.py) trims summary rows to the listing fields: id, title, description, status, order_index and progress. The plan is get_milestone's job. user_id, project_id and timestamps repeat what the caller knows. - enter_project and get_project share one block: every open milestone plus the 5 most recently updated done ones, in order. milestone_summary_omitted is attached only when older done ones were left out, and names list_milestones and get_milestone. - list_milestones lists every milestone, done included, without bodies. It is the call the omitted line points to, and it had the same size problem. - The REST project summary is unchanged; the web UI reads it. Tests: trimming, the done cap and its order, the omitted key present and absent, get_project and list_milestones, and a size ceiling on enter_project's milestone block for a 200-milestone history. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01821k5B3Ysecp9fNYs92Kuy |